5.5 Construction Investigation
5.5.1 The construction investigation shall be carried out in a real-time way on the premise that the detailed investigation has been done,according to the actual gedogical conditions exposed during construction excavation.
5.5.2 The construction investigation shall include the following tasks:
1 Draw gedogical maps of tunnels,shafts,and caverns,bedrock gedogical maps of cavern tops,walls,and floors,and water content figures of cavern-surrounding rocks;
2 Measure stresses of blasting relaxation zone and rock mass;
3 Carry out gedogical forecast;
4 Measure the cavern water inflow rate and predict the ground water table recovery after it is put into production;
5 Carry out an engineering gedogical study on complex gedogical problems,propose a construction plan,and if necessary,carry out a supplementary investigation;
6 Prepare the construction investigation report.