6.3 Nitrogen Sealing Device

6.3.1 Prior to installation,the orifice of nitrogen sealing ring shall be checked and unobstructed.

6.3.2 During installation of nitrogen sealing rings,their longitudinal and horizontal center lines shall be adjusted,and the measurement by plumb wire should be carried out,with the tolerance of 5.0mm.