- DL/T5232-2010±800kV及以下直流换流站电气装置安装工程施工及验收规程(英文版)
- 中国电力企业联合会
- 59字
- 2021-04-01 14:07:24
3.29 Step Potential Difference
A potential difference created between two points 0.8 m apart on the earth surface horizontally when grounding short-circuit(fault)current flows through earth-termination system.The potential difference between a side electrode of earthing grid and the point 0.8 m apart on the earth surface horizontally from this electrode is called maximum step potential difference.