- GB50742-2012炼钢机械设备安装规范(英文版)
- 中国冶金建设协会
- 12字
- 2021-04-04 23:48:02
11 Installation of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter
11.1 General Requirements
11.1.1 The track for vacuum tank car shall be installed according to the requirement of Section 10.1 of the code.
11.1.2 The vacuum tank car shall be installed according to the requirement of Section 10.2 of the code.